The following is an account
of the history of No.85 from her working days through to today. This
article appears in Issue 283 of Steam Railway magazine in Spring 2003.
Merlin
still weaving its Irish magic
GNR(I) 4-4-0 Merlin
is the only full-size working compound locomotive anywhere in the British
Isles, but this year sees the end of its main line career, for now at least.
To mark this, the Railway Preservation Society of Ireland has organised
an exciting programme of farewell trips, but if you want to see this magnificent
machine in action, you need to be quick...
BY GERRY MOONEY.
There’s something very special
about Merlin, the last remaining full-sized compound locomotive
at work anywhere in the British Isles. There always was.
Merlin dates from
1932, and is one of the Great Northern Railway (Ireland)’s famous ‘V’ class
4-4-0s. The ‘V’s were the most celebrated engines designed by George
T. Glover, who before he became Chief Locomotive Designer for the GNR(I)
in 1912 (a position he held until 1933) had worked for England’s North
Eastern Railway. Glover built all of his locomotives with superheaters
and he also superheated all of the earlier GNR(I) 4-4-0s (apart from the
‘J’s) which he inherited. It gave the railway the largest proportion of
superheated locomotives in Ireland at the time.
The compound ‘V’ class locomotives
brought much interest from the railway press when they were built.
The first three-cylinder engines in the whole of Ireland, they weighed
103 tons 11 cwt including tender. For the time they were also unusual
in having round-topped boilers and Stephenson’s valvegear.
More than 70 years on, Merlin
has given pleasure to many people since the official launch of its preservation
career in 1986 - and only ever experienced minor mechanical problems.
In fact, No.85 is one of the best in the Railway Preservation Society of
Ireland stable, but then she is a GNR(I) engine after all!
This year, though, the fun
comes to an end. Merlin’s boiler ticket expires in the autumn
and with plenty of other projects for the RPSI to concentrate on (including
the overhauls of ‘J15’ 0-6-0’s Nos. 184 and 186), there are no plans for
a return to steam. With that in mind, the RPSI has put together a programme
of trips to mark the end of the last compound’s current career. There
are return trips over the old Great Northern main line from both Dublin
and Belfast, but the highlight will be when Merlin heads out on
to the Southern main line for a return trip from Dublin (Connolly) to Cork,
on the weekend of September 6/7. That’s a trip of 339 miles, and what better
way for Merlin to say farewell to than to take a heavy train up
the severe climb out of Cork - a sure test for any engine if ever there
was one?
Public pressure - and
an LMS compound connection
That we have Merlin
to enjoy today is due indirectly to public pressure more than 70 years
ago. The compounds came about as a result of public demand for better timing
and standards on the main GNR(I) route from Dublin to Belfast. The locomotives
previously working the service were old ‘S’ (such as surviving No. 171
Slieve Gullion) and ‘S2’ 4-4-0’s which were giving trouble, particularly
with broken crank axles. Raising the boiler pressure on these locomotives
from 175 to 2001b/sq in a bid to improve performance had increased power
but also the maintenance needed and soon the pressure was brought back
down to 175 1b/sq in. Something new was desperately needed.
While the design for the
‘V’ class was being prepared, the GNR(I) sent men over to the LMS to experience
and learn from the compounds in use in Britain at the time.
The main dimensions of the
LMS design (one of which, No.1000, is preserved at York) included 6ft 9in
driving wheels, a 19in x 26in high-pressure cylinder and two 21in x 26in
low-pressure cylinders. The working pressure was 200lb/sq in with a tractive
effort of 22,649lb. However, the Great Northern design ultimately had 6ft
7in driving wheels a 17¼ in x 26in high-pressure cylinder, 19in
x 26in low-pressure cylinders and 250 lb/sq in working pressure, which
produced a tractive effort of 23,762 lb. Interestingly, both designs had
the coupling rods outside the connecting rods. The compounds - or
‘Pounders’ as they became known by crews - were built during the Depression
and cost £5,847. That was £3,000 cheaper than the same
railways ‘SG3’ 4-4-0 class, built between 1920-22.
The ‘V’ class engines were
ordered from Beyer Peacock (without tenders, which were built in Dundalk)
and delivered at weekly intervals between April 9 and May 5 1932. They
carried the numbers 83-87 and were named after birds of prey: Eagle
(No. 83), Falcon (84), Merlin (85), Peregrine (86),
and Kestrel (87).
The compounds were introduced
before the start of the new accelerated times for the 112-mile Dublin-Belfast
main line, which clipped up to 22 minutes off workings. These were
tight schedules and severe maintenance problems arose: hot boxes, problems
with connecting rods and even, soon, boilers needing a re-tube. As
a result, the boilers’ working pressure was reduced to 200lb/sq in, which
brought the tractive effort down to just over 19,000lb.
In 1946 the first rebuild
took place when No. 87 Kestrel received a Belpaire-style firebox, built
by Harland and Wolff of Belfast. This was the first GNR(I) locomotive to
have a Belpaire firebox, A new-style boiler was fitted to Merlin
in May 1950 when the old boiler was rebuilt for use as a spare for the
‘V’ and newer ‘Vs’ classes.
The GNR(I), which prided
itself on its style and elegance, introduced a new non-stop service between
Belfast and Dublin in August 1947. This train, the ‘Enterprise’, still
runs to this day - albeit without the style of a ‘V’ or ‘Vs’ at the helm.
The prestigious train was restricted to seven bogie vehicles and the inaugural
service was hauled by No, 83 Eagle, coupled to a 3,500 gallon tender
for the run,
During the early 1950s the
‘Pounders’ shared most of the heavy main line work with the newer ‘Vs’
class but, with the introduction of new railcars in 1957, the class was
relieved of its main duties.
From October 1958 the old
GNR(I), (actually now the Great Northern Railway Board, or GNRB) was split
between Northern Ireland’s Ulster Transport Authority (UTA) and the Republic’s
Coras Iompair Eireann (CIE). Compounds Nos. 83, 86 and 87 went to the UTA
and Nos. 84 and 85 went to CIE, with the letters ‘UT’ or ‘CIE’ stencilled
on the front bufferbeam of the locomotives.
Merlin spent part
of 1958 in Dundalk works, eventually appearing with a ‘Vs’ class tender.
With little work for the engine, the 26-year-old veteran was usually kept
‘spare’ around Dundalk, but did sometimes appear on the 12.45pm Dublin
train and the 5.35pm return. Steam finished on CIE in 1963 and Merlin
was inspected for possible purchase by the UTA. However, ‘Vs’
class No. 207 Boyne was eventually purchased and went north instead. The
rejected Merlin moved to Dublin (Amiens Street) and then to the
city’s Inchicore Works for scrapping.
But it didn’t happen.
At the time the Witham Street Transport Museum in Belfast had plans to
acquire the last of the compounds and in the end a purchase was agreed,
with the locomotive (minus its tender) costing £600. Buffers
and drawgear were fitted to the cab end of the engine and the 4-4-0 was
moved from Inchicore to Amiens Street in April 1965, then to Dundalk the
following month. It remained there for more than a year before mowing to
Belfast’s Adelaide shed. When Adelaide closed, No.85 moved to the
goods store in Lisburn and it wasn’t until late 1969, four years after
purchase, that Merlin finally arrived at the museum in Witham Street.
On the move again
The compound was as displayed
inside the cramped museum for nearly eight years until negotiations between
the late Lord Dunleath, the Railway Preservation Society of Ireland and
the museum saw it on the move again - this time to the engine works inside
the Harland and Wolff complex at Queen’s Island in Belfast. An overhaul
followed which included replacing areas of wasted boiler plate, fitting
new stays, new tubes, superheater elements, and glands and the repair of
a crack in the cylinder block. Merlin then moved to the RPSI’s
Whitehead headquarters where the boiler cladding was fitted and the engine
paired with a former ‘Vs’ class 4,000-gallon tender. It ran with this for
a couple of years before it was replaced with a smaller 3,100-gallon tender.
After a series of running-in
trips in 1985 and 1986 Merlin was officially launched into traffic
on June 30 1986 by Lord Dunleath who himself drove the locomotive through
a red tape, marking the start of a new career for the newest locomotive
in the RPSI) stable.
On September 13 the dedicated
people who had traveled behind, timed and worked on this magnificent machine
saw something they’d thought they never would again: Driver Billy McCaughley
and Fireman Jackie Kitchen took the compound back to where it really belongs
- the Great Northern main line. The first trip from Belfast to Drogheda
was really a warm-up for the big one: the official Belfast - Dublin –‘Enterprise’
the following week. When the big day arrived, Merlin set off with
eight coaches in tow from Belfast (Central) to Dublin (Connolly). There
were incredible scenes on arrival when many people who hadn’t seen a compound
in the Irish Capital for over 20 years gathered around the engine, along
with others (including myself) who were taking all this in for the first
time...
It was the start of a remarkable
career. In May 1987, as part of the RPSI’s major annual tour No. 171 Slieve
Gullion hauled the train from Dublin to Galway and back, but Merlin
traveled from Belfast to take the train back north. No, 85 was there
to meet No. 171’s arrival, and for just a short time, two GNR(I)
lined blue locomotives were once again in steam at the old company’s headquarters.
Then came the 40th anniversary of the ‘Enterprise’ in August. It
was the same length train as in 1947 (seven bogie vehicles) but this time
the compound at the front was Merlin. The timings were the same
as the original run (how often is that possible with main line steam?).
But Merlin, complete
with 4,000 gallon tender, ran to Dublin with no problems… and arrived at
the stop block with minutes to spare from the 2 ¼ hour schedule.
It was another milestone in the comeback of a wonderful engine... |